Part 1 · Week 1
Specification review
Tell us the length, water type, depth and loads. Our engineers configure the walkway around your pumps, pipes and access needs.
See the specification →Worldwide delivery
500 m
of walkway in one 12 m container
25 min
per section with 2–3 fitters
3 ways
to ship: RTA, semi or fully assembled


Part 1 · Week 1
Tell us the length, water type, depth and loads. Our engineers configure the walkway around your pumps, pipes and access needs.
See the specification →
Part 2 · Production
Manufactured under ISO quality control in USA and Europe with fabrication partners in 6 regions, then packed in crates or containers.
See where it shipped →
Part 3 · On site
Pre-drilled components go together on the bank with the tools supplied. On-site assembly training is offered.
Assembly questions →Every fitting, fastener and tool travels with the sections. Here is where the scope starts and stops.

Scope to be confirmed per order in the proposal.
06 / Worldwide delivery
Pre-formed, pre-drilled and freighted assembled or in crates, with every fastener and tool included. On-site assembly training is offered.

Option 01
RTAAll fittings and components packed in 21 m × 1.5 m crates, with a jig and all specialised tools. Ideal for 200 m+ with a local team. One 3 m section in about 25 minutes.
Option 02
Most popularSections and handrails are assembled and stacked inside the container. Two fitters attach handrails and join the walkway in about 15 minutes.
Option 03
Lights and de-icers fittedBest when site costs are high, the climate is hard and the job is urgent. Typically the pivot (snake) walkway or the foldable heavy lift walkway.
Projects completed all over Sub-Saharan Africa, the Amazon jungle, Arctic Canada, the mountains of Asia and South East Asia.


Five things. If one is missing we'll work it out together on the specification call.
01
Barged down the river from Pucallpa, then lifted 18 miles into the jungle by helicopter.
02
Trucked in fully assembled on an ice road to a uranium mine.
03
417 m and a pump platform for an Algerian irrigation reservoir.
500 m of walkway arrives as one 12 m container, where other walkways need a convoy of trucks.
About 250 m of 1.5 m walkway in a 6 m container and 500 m+ in a 12 m container when shipped ready to assemble.
2–3 fitters build one 3 m × 1.5 m section in about 25 minutes. Semi-assembled sections are joined by two fitters in about 15 minutes.
Yes. The walkway is designed to be bolted together by your own or a local crew, with the tools supplied. Training on site is offered.
Yes. Walkways have been barged down the Amazon and lifted in by helicopter, trucked up ice roads in Canada and hauled into mountains in Turkey.

Next step
Water, length, location, delivery. Four short steps, then a proposal.