Worldwide delivery

Three steps from specification to floating.

  1. 500 m

    of walkway in one 12 m container

  2. 25 min

    per section with 2–3 fitters

  3. 3 ways

    to ship: RTA, semi or fully assembled

Crews unloading walkway sections from shipping containers

From one specification
to a walkway on your water.

Specification review

Part 1 · Week 1

Specification review

Tell us the length, water type, depth and loads. Our engineers configure the walkway around your pumps, pipes and access needs.

See the specification →
Built and shipped worldwide

Part 2 · Production

Built and shipped worldwide

Manufactured under ISO quality control in USA and Europe with fabrication partners in 6 regions, then packed in crates or containers.

See where it shipped →
Assembly and install

Part 3 · On site

Assembly and install

Pre-drilled components go together on the bank with the tools supplied. On-site assembly training is offered.

Assembly questions →

One order. Everything in the box.

Every fitting, fastener and tool travels with the sections. Here is where the scope starts and stops.

Pivot walkway delivered fully assembled to a uranium mine in Northern Canada

What the order covers

  • All walkway sections, floats, decking and handrails
  • Every fitting and fastener, pre-formed and pre-drilled
  • Jig and specialised tools for assembly (RTA)
  • Crates or containers packed for sea and road freight
  • On-site assembly training, if requested

What it does not cover

  • Civil works on the bank
  • Cranes and lifting equipment on site
  • Local labour for assembly
  • Pumps, pipes and cables carried by the walkway

Scope to be confirmed per order in the proposal.

06  / Worldwide delivery

Structures delivered worldwide, economically.

Pre-formed, pre-drilled and freighted assembled or in crates, with every fastener and tool included. On-site assembly training is offered.

504 m of walkway fits in a 12 m container and 252 m in a 6 m container, compared to landmark heights

Option 01

RTA

Delivered ready to assemble

All fittings and components packed in 21 m × 1.5 m crates, with a jig and all specialised tools. Ideal for 200 m+ with a local team. One 3 m section in about 25 minutes.

6 m container
250 m
12 m container
500 m+

Option 02

Most popular

Delivered semi-assembled

Sections and handrails are assembled and stacked inside the container. Two fitters attach handrails and join the walkway in about 15 minutes.

6 m container
30–40 m
12 m container
72–96 m

Option 03

Lights and de-icers fitted

Delivered fully assembled

Best when site costs are high, the climate is hard and the job is urgent. Typically the pivot (snake) walkway or the foldable heavy lift walkway.

Flatbed truck
14 m

Projects completed all over Sub-Saharan Africa, the Amazon jungle, Arctic Canada, the mountains of Asia and South East Asia.

Crews unloading walkway sections from shipping containers
Unpacking on site
Truck carrying walkway sections on a forest road in Canada
Road freight, Canada

What you need to have ready.

Five things. If one is missing we'll work it out together on the specification call.

Water type
Tailings, sea water, fresh water or a dam, and the pH if known.
Length and layout
Total walkway length, plus any platforms for pumps, penstocks or decant points.
Maximum depth
Water depth at the deepest point, so we can specify the anchoring.
Site location
City and country, and how trucks or containers reach the bank.
Delivery date
When the walkway needs to be floating, so we can choose RTA, semi or fully assembled.

Remote sites are the normal job.

01

The Amazon

Barged down the river from Pucallpa, then lifted 18 miles into the jungle by helicopter.

02

Arctic Canada

Trucked in fully assembled on an ice road to a uranium mine.

03

The Sahara's edge

417 m and a pump platform for an Algerian irrigation reservoir.

500 m of walkway arrives as one 12 m container, where other walkways need a convoy of trucks.

Questions we get asked.

How much walkway fits in one container?

+

About 250 m of 1.5 m walkway in a 6 m container and 500 m+ in a 12 m container when shipped ready to assemble.

How long does assembly take?

+

2–3 fitters build one 3 m × 1.5 m section in about 25 minutes. Semi-assembled sections are joined by two fitters in about 15 minutes.

Do we need our own crew?

+

Yes. The walkway is designed to be bolted together by your own or a local crew, with the tools supplied. Training on site is offered.

Can you deliver to remote sites?

+

Yes. Walkways have been barged down the Amazon and lifted in by helicopter, trucked up ice roads in Canada and hauled into mountains in Turkey.

All questions →

Helicopter lifting Xrosswater crates in the Peruvian Amazon

Next step

Start with
a quote.

Water, length, location, delivery. Four short steps, then a proposal.