300 m walkway plus a 6 m deep × 300 m tailings barrier to keep sediment out of the pump. Designed, supplied, assembled and installed in only 10 weeks.
Downloads
Since 1998 the founder has pioneered floating walkways and platforms on mine tailings dams, dredging and industrial marine work. Xrosswater has delivered more than 15,000 m to some of the world's largest mining and mineral corporations, from Africa and Asia to South and North America.
01 / Case histories

PDF 01

PDF 02

PDF 03

PDF 04

PDF 05

PDF 06

PDF 07

PDF 08

PDF 09

PDF 10
02 / All projects
300 m01 · Northern British Columbia · Canada
300 m walkway plus a 6 m deep × 300 m tailings barrier to keep sediment out of the pump. Designed, supplied, assembled and installed in only 10 weeks.
600 m02 · Fort McMurray, Alberta · Canada
600 m floating pivot walkway with cable trays for an oil sand dredging operation, designed and delivered within 6 months of the first request.
Case history PDF
102 m+03 · Northern Canada · Canada
Pivot walkway depositing heavy uranium tailings in an arc pattern, with Paterson & Cooke consulting engineers. Delivered fully assembled via ice road.
Case history PDF
Pre-assembled04 · Alberta · Canada
Custom pump platforms for tailings density analysis equipment, pre-assembled and delivered in a 53 ft van trailer.
200 ft05 · Arizona · USA
Extreme design walkway in FRP and stainless steel for Taseko's new Florence copper mine.
Case history PDF
500 m06 · Yanuyacu reserve · Peru
500 m shipped RTA in one 12 m container to Lima, trucked to Pucallpa, barged down the Amazon and lifted by helicopter 18 miles into the jungle.
Case history PDF
810 m07 · Southern Africa · Botswana
810 m walkway with a penstock water intake platform, anchored with helical anchors. Delivered in one 12 m and one 6 m container.
Case history PDF
96 m08 · Coast of Namibia · Namibia
Jetty for unloading diamond-bearing gravel from diver boats, ending in a 6 m × 6 m platform with pump and hopper system.
500 m09 · KwaZulu-Natal · South Africa
Shipped semi-assembled in 6 containers with FRP handrails, anchors and chain, including 2 large penstock intake platforms.
Case history PDF
374 m10 · West Africa · Sierra Leone
Delivered RTA in component form and assembled by a local workforce at about 40 m per day in hot, humid conditions without cover.
Case history PDF
417 m11 · Edge of the Sahara · Algeria
417 m walkway and a large aluminium pump platform with trolley hoist, pumping reservoir water to irrigate farm fields in the dry season.
Case history PDF
2 ponds12 · Eastern Turkey · Turkey
Shipped to the Black Sea port of Trabzon and hauled up the mountains. Built RTA by the client on two tailings ponds.
140 m13 · Jubail · Saudi Arabia
Modular walkways for structural rehabilitation and monitoring at the world's largest power and desalination plant, working even in fast-moving water.