417 m walkway and a large aluminium pump platform with trolley hoist, pumping reservoir water to irrigate farm fields in the dry season.

The job
417 m walkway and a large aluminium pump platform with trolley hoist, pumping reservoir water to irrigate farm fields in the dry season.
- Client / site
- Irrigation reservoir
- Country
- Algeria
- Region
- Edge of the Sahara
- Supplied
- 417 m


