← All projects

Case record 02 / Canada

Oil sands dredging, Albian Sands

600 m floating pivot walkway with cable trays for an oil sand dredging operation, designed and delivered within 6 months of the first request.

Pivot walkway at the Shell oil sands dredging operation in Canada

The job

600 m floating pivot walkway with cable trays for an oil sand dredging operation, designed and delivered within 6 months of the first request.

Download the case history (PDF)
Client / site
Oil sands dredging, Albian Sands
Country
Canada
Region
Fort McMurray, Alberta
Supplied
600 m